Pool Pros Tundra Tuff Above Ground Pool Installation System.  This system was developed over 18 years of building, repairing and servicing Above Ground Swimming Pools in the Frozen Tundra of Green Bay. Throughout that time I have seen first hand what the harsh winters can do do above ground pools. We developed a solid process with solid results.

The Tundra Tuff Above Ground Pool Installation System relies on a solid foundation. This starts out with excavation. The single most important Tundra Tuff Above Ground Pool Installation Systempart of the process. Pool Pros excavates our pools ourselves, with our own equipment. Our pools are excavated and hand tuned to 1/8″ tolerance.

Our pool tracks are placed and rounded on this excavated virgin soil base.  This gives the base of the pool the most solid foundation possible. We do not use patio blocks. This is a common mistake, but in the unforgiving winters of  the frozen tundra, these patio blocks will be heaved out of the ground when the frost sets in. Thus damaging your pool.

Our next step is to place screened mason sand( that Pool Pros provides) in the center of the pool bottom track. (not under). After the sand is placed it is roughly raked out.Tundra Tuff Above Ground Pool Installation System

Then we begin assembling the pool. As we unroll the pool wall we add top stabilizer bars, uprights and top caps. This gives the pool the strength needed to stay standing while the pool is completed. We also use strategically placed stakes and bungee cords to add more strength to the pool during installation.

After the pool is assembled, and cove is installed, we rake the sand one last time to uniform thickness. We then dampen the sand with a garden hose. After that we use a plate compactor to compact the sand base. After the compactor is removed from the pool, we hand trowel the entire bottom to give the pool a complete finish.Tundra Tuff Above Ground Pool Installation System

At this point we begin installing the liner. This is done entirely from outside the pool. We have a special technique that allows the wrinkles to be pulled out via a specialized vacuum and specialized liner broom. Using this method we never have to enter the pool once it has been trowelled.

Now we begin filling the pool from clients source, assemble the pump and filter equipment and load tools and equipment onto the tuck.

As you can see the Tundra Tuff Above Ground Pool Installation System exceeds what is provided by competitors and exceeds what is known as the industry standard for Above Ground Pool Installation. The Tundra Tuff System does take longer to complete so it does carry a higher price tag than our competitors, but this process and your pool  will be built to withstand the harsh winter climate of the Frozen Tundra. It will also be built by the only APSP Certified Building Professional that builds Above Ground Pools.

We also offer our new Tundra Shield Pool Insulation to protect your pool from heat loss by up to 80%.

When you are looking for a Quality Above Ground Pool and a Quality Above Ground Pool Builder, look no further than Pool Pros. When Quality Counts, Count on Pool Pros.

Trevi ABove Ground Pool

Contact Pool Pros today for free estimate

 

 